Skip to main content

Bathroom Remodeling

Bathroom Remodeling in Sterling Heights, MI

Insured & established · free estimate · a real number, not a guess.

Macomb's second-largest city, 1970s–90s colonials and split-levels on larger lots.

Get Your Free Estimate

Insured & Established · No obligation · Same-day callback

Step 2 of 3

Optional — but the more you share, the sharper your estimate.

Prefer to talk now? Call (586) 419-8234

Sterling Heights houses typically came with a hall bath and an ensuite, both original, both small by current standards. The hall bath is usually a five-foot tub alcove with a fibreglass surround gone brittle; the ensuite often has a corner garden tub nobody has filled in fifteen years. Converting that garden tub to a full tiled shower is the most requested job we do in this city, and it usually gains real usable floor area as well.

Why it pays in Sterling Heights

Plumbing here is copper and PVC rather than galvanised, so bathroom work in Sterling Heights rarely turns into a whole-house repipe the way it can in older parts of the county.

What we build

  • Full bathroom remodels — from refresh to full rebuild.
  • Tub-to-shower conversions — and walk-in / curbless showers.
  • Vanities & countertops — the pieces buyers notice first.
  • Tile & flooring — clean, modern, built to last.
  • Fixtures & lighting — the quick wins that modernize a bath.
  • Powder rooms — small space, high impact.
  • Accessibility & aging-in-place — safe, comfortable, done right.

How we work

From first call to final walkthrough.

  1. 1

    Intro call

    A quick call to understand your project, your goals, and your timeline.

  2. 2

    On-site walk-through

    We come measure, look at the space, and talk through what's possible.

  3. 3

    Planning & design

    We lay out the scope, materials, and layout so you know exactly what you're getting.

  4. 4

    Written contract

    A clear, itemized estimate and scope in writing. The number we quote is the number you pay.

  5. 5

    We build it

    Our crew does the work — permitted, inspected, and on the timeline we set.

  6. 6

    Finish & walkthrough

    We walk the finished job together and make sure every detail is right.

  7. 7

    Final payment

    You pay when the work is done right — not before.

How long it takes

Most bathrooms run 7–10 days. You get the timeline and the price in writing up front.

Free written estimate in Sterling Heights.

Tell us about your bathroom remodeling project — we'll send back a real, written number, not a guess. No pressure.

No obligation · Same-day callback

Our work

Real remodels, right here in Metro Detroit.

Before-and-afters from recent Done Right Homes projects.

Backed by our work

Workmanship guaranteed.

If any part of the job wasn't done right, we come back and make it right. We don't call a job finished until it's done right.

Insured & established in MI

Bathroom Remodeling questions

Straight answers.

Planning your Sterling Heights budget? Read our bathroom remodeling cost guide for typical Metro Detroit ranges.

Nearby areas

Bathroom Remodeling near Sterling Heights

Get your free Sterling Heights bathroom remodeling estimate.

Free written estimate · no obligation · we usually call back the same day.