Skip to main content

Kitchen Remodeling

Kitchen Remodeling in Clinton Township, MI

Insured & established · free estimate · a real number, not a guess.

One of Michigan's largest townships — decades of subdivisions, family-oriented.

Get Your Free Estimate

Insured & Established · No obligation · Same-day callback

Step 2 of 3

Optional — but the more you share, the sharper your estimate.

Prefer to talk now? Call (586) 419-8234

Clinton Township kitchens split along the same line the housing does. The 1960s and 70s houses have small closed galley kitchens with a doorway to the dining room and a soffit hiding ductwork — opening those up is a structural conversation. The newer builds off Hall Road have the space already and need a re-plan rather than a wall removed. The one thing both share is original wiring never intended to carry a modern kitchen's circuits.

Why it pays in Clinton Township

Clinton Township covers so many housing eras that the honest first step is a measure and a look behind one cabinet, not a quote over the phone.

What we build

  • Cabinets — new or refaced.
  • Countertops — quartz, granite, solid surface.
  • Islands, layout & flow changes — open it up to how you live.
  • Lighting, flooring, backsplash & tile — the finishes that pull it together.
  • Appliance installation — fitted and connected.
  • Full remodels & targeted refreshes — from a smart update to a full rebuild.

How we work

From first call to final walkthrough.

  1. 1

    Intro call

    A quick call to understand your project, your goals, and your timeline.

  2. 2

    On-site walk-through

    We come measure, look at the space, and talk through what's possible.

  3. 3

    Planning & design

    We lay out the scope, materials, and layout so you know exactly what you're getting.

  4. 4

    Written contract

    A clear, itemized estimate and scope in writing. The number we quote is the number you pay.

  5. 5

    We build it

    Our crew does the work — permitted, inspected, and on the timeline we set.

  6. 6

    Finish & walkthrough

    We walk the finished job together and make sure every detail is right.

  7. 7

    Final payment

    You pay when the work is done right — not before.

How long it takes

Most kitchens run 4–8 weeks, depending on scope — a refresh is faster than a full layout change. You get the timeline in writing up front, with the price.

Free written estimate in Clinton Township.

Tell us about your kitchen remodeling project — we'll send back a real, written number, not a guess. No pressure.

No obligation · Same-day callback

Our work

Real remodels, right here in Metro Detroit.

Before-and-afters from recent Done Right Homes projects.

Before — kitchen
Before
After — renovated kitchen by Done Right Homes
After

Full kitchen remodel — new shaker cabinets, quartz counters, tile backsplash, and stainless appliances.

Backed by our work

Workmanship guaranteed.

If any part of the job wasn't done right, we come back and make it right. We don't call a job finished until it's done right.

Insured & established in MI

Kitchen Remodeling questions

Straight answers.

Planning your Clinton Township budget? Read our kitchen remodeling cost guide for typical Metro Detroit ranges.

Nearby areas

Kitchen Remodeling near Clinton Township

Get your free Clinton Township kitchen remodeling estimate.

Free written estimate · no obligation · we usually call back the same day.